ADOT to Repair Potholes on Gila River Bridge on Nov. 9

The Arizona Department of Transportation is scheduled to patch potholes on the SR79 Gila River Bridge next Tuesday, November 9th, starting at 9:00am. The anticipated length of the road work is four to six hours. One lane of traffic will remain open at all times. Please respect the need for reduced speeds during the construction period and obey the ADOT personnel directing traffic.

2016-11-15T11:20:19+00:00 November 5th, 2010|

About the Author: